Tramway Rabat Salé

Tramway Rabat Sale is a system of transport through railways to serve inhabitants of the urban agglomeration of Rabat Sale.

This project which was inaugurated by his majesty Med VI on May 11th , 2011 is considered one of the convenient solutions to the problem of urban transport in the two cities since it satisfies  the increasing demand for transport  .It also provides a real alternative to using cars, and because it aims at simplifying the movement of traffic and circulation and rendering it easy to  Rabat Sale through adopting means of transport and traffic which respect the environment and guarantee the conditions of safety and organization at work.This project is one of those which gained priority in the context  of  managing and developing the banks of Abu Regreg.

The current web of the tramway consists of two rails whose length reaches 19,5 km and which have 31 stations.

The web covers the most important urban poles that know a high population density of inhabitants and their movements (university neighborhoods, hospitals, administrations, the centers of the two cities, the important road and train stations).

Wagons used, and whose length reaches 32 m, are characterized with a design that respects international criteria and they have air conditioning equipments and  entrances for people with special needs.

The project whose launch of work was given by his majesty Med VI on December 23rd, 2007, was performed by the agency of management of the banks of Abu Regreg in partnership with the local communes of Rabat Sale. Starting from January 2009, the company of the tramway of Rabat Sale which incorporates among its contributors the commune of Rabat Sale the one which supervises   the work proceedings .   

The tramway works through two major lines:
  • The restructured line to the urban agglomeration from Karima neighbourhood  in Sale to Madinat Alirfane in Rabat on a distance of 11,7 km and it includes the major poles to the two cities through 22 stations and the period of the journey in this line lasts 36 mns.
  • A line special for the inhabitants of neighbouhoods with high population density, like Yaakoub Almansor in Rabat and Bettana in sale city through 14 stations and on a distance of 7,8 km, the time of the journey in this line lasts 25 mns.
  • The average of frequency of the tram in each section reaches 8 mns, whereas this frequency in the shared section from   Bab Lemrissa to Aljoulan square reaches 4mns. All the lines have two parts.

It is likely to extend the two current lines to reach new places in the direction of Temara, New Sale and other areas.

Developement of the Bouregreg Valley

The project of managing banks of Abi Raqraq River which cover a surface of 6000 hectares aim at managing the site  and  developing its space  with total respect to environmental conditions.This big project consists of six complementary parts especially Bab Albahr,Amwaj,Qasbah Abu Regreg,Sahrij Alwad,Almanzah Alkabir,Buhairat Assuhul.

At  the beginning ,work focused on the first and second parts:

The first part:

Bab Albahr is a place meant to be an entertainment center for Sale and Rabat inhabitants and this project is considered as the fruit of cooperation between the agency of managing the banks of Abi Raqraq river and the institution of The international Crossing for Investment in Abu Dhabi.

The amount of investment  in the project of Bab Albahr  is 7 billion dirhams  on a surface of 30 hectares. 530.000 m2 set for habitat blocks , hotels, services and public equipments, besides a group of entertainment poles in the space for  Arts and Crafts. And they are formed of the following projects:

1.Performing a subway project for the urban agglomeration Rabat Sale, whose official start was given by his majesty Med VI on December 23rd, 2007, and it is part of  a general strategy to  rehabilitate  urban public transport in the two cities. The length of the tramway rails 19km in 31 stations, and it includes two trails:

  • Rail number 1 : which is considered the basic line of  the project, it goes from Karima neighborhood in Sale to Madinat alirfane, and Hospital Ibn Sina in Rabat, moving through important places in the cities: Avenue Med V in Sale, Mohamed V, Alwizarat and train stations,( Sale city, Rabat city) and universities.
  • Rail number 2: Joins Almohit Neighbourhood   and   Yaakoub Almansour (Hospital Moulay Yousef) with neighbourhood  Bettanna   in Sale passing through Bridge Moulay Elhassan on Abi Raqraq river.

2.Building the new Bridge Moulay Elhassan whose launch of work was given by his majesty Med V in 2007, it is distinguished on the one side by its special architecture and urban integration and on the other side by its huge shape ,hence it stretches along 1,2 km and it is formed of two parallel ways with three tracks for pedestirians and cyclists and a special track for tramway with two lines.

3.The project of Oudaya tunnel : it goes  from  Madarat  Bab Albahr in the direction of the Cemetery of Achouhada from the side of the sea along a distance of 1022 . The creation of this tunnel aims at solving the problems of traffic which Rabat and Sale city know and to alleviate the  pressure  and  jams in the old road.

4.The entertainment post Marina Abu Raqraq is considered one of the important projects which form an important factor of attraction. Due to its extension on a surface of 8 hectares, it can receive 350 entertaining complexes, and it is surrounded by a number of restaurants , entertainment places ,houses ,high quality hotels and tourist places like the space of Hassan Minaret ,Bab Lemrissa and the old city of Sale.

The second part:

Taking into consideration its central location between the right and the left banks of Abu Raqraq river, and its role as a linking point between  estuary  Abu Raqraq and  Alwalja  plain, this part represents the major part  of the project and it is distinguished with a Mediterranean architectural design on a global surface of 112 hectares, set to establish  :

  • Luxurious hotels
  • Shopping places.
  • A museum.
  • A park of 10 hectares (between the theater and the bridge).
  • The large theater of Rabat with a special design on a surface of 27000 m2.

www.bouregreg.com

www.tram-way.ma

The modernization of communal administration

Digitizing the services of the civil status “an ambitious project to serve citizens” :

In the frame of efforts to modernize the communal administrative services directed to  citizens  , Sale commune started a comprehensive project to update the services of the civil status. To achieve this ,many deals were concluded related to rehabilitation of  the  administrative  bureaus  of the civil status and equip them with necessary tools and train functionaries responsible for these bureaus. The general objectives of the project revolve around  improving  the conditions of work of employees of these bureaus and presenting a better service for citizens through:

  • Managing the bureaus of the civil status by adopting the open space.
  • Equipping the bureaus of the civil status with the furniture of the bureaus and informatics equipment.
  • Digitizing civil status files ( more than five hundred thousand acts) and the adoption of a digital application to use them and the provision of an electronic data basis to the documents of the civil state in a way that adopts new technologies.
  • Providing the bureaus of the civil state with equipments to organize queuing and with surveillance cameras.
The adoption of a special informatics program for local taxes:

To develop its financial resources and to develop its private earnings through the promotion  of  material and human resources  to get local taxes, the communal council of Sale adopted a special informatics program which enables the agencies of earnings  in the commune and the other communal services related to it like the urbanization services and communal and technical services and others to list all the concerned people  and deal with their  files   and collect taxes  and this through an efficient automatic manner and with a total respect of  the deadlines and regulations  in effect.

This program will enable  to:

  • The general automation to manage  local  taxes .
  • Providing the necessary information for decision taking.
  • Quickening the operations and regulations of management.
  • Automatic control and follow up of different files.
The single window for  construction permissions with high professional qualities:

Accompanying  the  new  legal  developments  which the sector of urbanization knows, and which aim at providing the necessary conditions to develop it and guarantee its satisfaction to the needs of citizens and investors, through implementing   the policy of simplifying the rules and the steps of studying different projects, Sale commune set up  the single window  for the permissions of construction which the law decrees  according to the text number 2.13.424 issued on 24th may 2013, and which is related to agreeing on the general condition of construction  which determines the shape and the conditions of submitting permissions and the documents needed according to the legislation rules related to construction and real estate and  the division of real estate and the issued texts to apply them.

The single window for  permissions of construction is considered the only  interlocutor  to those concerned. It takes care of  following the track of applications starting from the time of submission to getting permissions, and for this purpose, it puts under their disposition all the necessary information related to the documents needed for the files of permission  demands  and  the regulations and ways of giving them and the processing situation of studying those files. It was constructed with modern architectural characteristics and it is equipped with all the assisting means of perfect management of the files of permission demands and the good reception of citizens. In addition, it was also equipped with a modern numerical system determining long distance reception appointments  and receiving and dealing with  demands of different  permissions in an electronic manner.

Adoption of a strategy and a planning for communication : For an efficient communication to a civic commune:

In the context of promoting the level of communication be it internal or external ,  since it is considered an essential pillar to communal work and bridging gaps and guaranteeing interaction with partners and enabling inhabitants to information and assuming their obligation in suggesting and evaluation , the commune of Sale , under the frame of the agreement it signed with the program of local governance, prepared a strategy and a planning of communication specific to the commune and its five districts, and which enables organizing and institutionalizing communication operations on all levels.

A work team formed of a group of employees of the commune and districts under the supervision of an expert charged from the program was charged of shaping  a strategy of communication based on the institutional , legal and constitutional references which stressed on the right of citizens  to access to information and on the role of communication in simplifying the management of general  local affairs .

The period of preparing this strategy was an occasion to diagnose the situation of communication in the commune through focus on weakness and strength points and also the challenges and opportunities which are considered as starting points which help in shaping a work plan to control  an efficient communicational relationship between concerned parts.

In application to the strategic vision of communication which form the essential core of  communication operation, the commune adopted a realistic communicational plan for a period of three years which includes  82  pragmatic  measures  .

Creating a section for informatics and communication systems:

The new systems of information depending on new technologies in mass media and communication have become an essential pillar to modernize communal administration and compatibility with the public policy in this field which aims at moving to a general electronic administration, a special sector for information systems and communication was created to take part in this development and keeping up with it.   

This sector  especially  takes  care of supervising  the development and performing informatics applications and systems suitable to different communal services according to the regulations in effect, and the preparation of data bases to enable users of precise information which enable them of good management of  the local situation. The service also works on managing the informatics of the commune ( equipments, webs…) and maintaining them and  taking measures  to protect them from dangers, besides presenting different forms of support  and assistance to the users of equipments and informatics programs, and  generalizing  the services of  electronic  communication on all the functionaries  of communal  services.

It also takes care of preparing and coordinating different operations of internal and external communication addressed to the public and to mass media and to different partners by depending on necessary means to cover different activities of communal services through preparing and publishing  pamphlets  and  periodicals  and continuous updating of the  content  of electronic  website of the commune and other communicational means.

Creating a special cell to follow up citizens  complaints:

The issue of managing complaints takes a big importance from the side of the communal council of Sale since it has a direct effect on the relationship between the administration and its people. For this purpose, the communal council of Sale created a cell which takes care of presented complaints according to criteria agreed  upon  and through a specific methodology  in  answer   to  citizens expectations and therefore the effective contribution to achieve good governance to communal administration and improve its services.

The cell receives citizens complaints addressed to the commune either in a direct way or through the central  bureau  of  control  or through the service meant for that in the electronic window of the  commune , and it studies them  ;follows their course and result  in coordination with all the concerned services and communal sectors. And for this purpose, the cell participates in diagnosing and attending to term meetings in the office of the general secretariat or in the administration annex  under whose territory  the  complaint takes  place .         

Strengthening  internal control through creating a section for examination:

For the sake of consolidating the control of administrative work , the implementation of projects , and the evaluation of works and activities as an embodiment   to the rules of good governance , there was the creation of the  service of internal investigation whose task is to activate the terms of reference  of control given to the head of the communal council, and it contributes through the works of evaluation it applies and the recommendations it issues in the efficient guidance of the commune , and for that it prepares the plans of internal investigation and updates  the map of the risks of the commune and gives close attention to  the implementation of the tasks of  control and examination   and to  preparing reports about them and  follows the  course of the activation of recommendations issued  from the unit of internal investigation or the external institutions of control and examination together with  preparing the plans of formation and finishing expertise for the benefit of the employees of the sector and  updating  the program of promoting excellence meant for  the activities of investigation.